Meet us at WindEnergy and WindEurope Summit 2016 in Hamburg!

    On September 27-30, the leading wind industry voices will gather at WindEnergy 2016 in Hamburg. Take advantage of this opportunity to speak to representatives from across our business, including senior management.

    Throughout WindEnergy 2016, you are invited to visit us at booth A1.521, where we will be showcasing:

    Meet a record-breaker: LM 88.4 P

    The longest, most advanced, wind turbine blade in the world! Powering an 8 megawatt wind turbine – this rotor is the ‘motor’ for one of the largest mechanical structures on earth. It has been designed and manufactured with sufficient quality and reliability to withstand 25 years of life offshore, in the harshest weather conditions and roughest seas. Breaking the world record for the longest wind turbine blade, LM Wind Power demonstrates once again our unique technical know-how and manufacturing expertise, enabling today’s offshore wind turbines to capture more energy from the wind, reduce the cost of energy and push the industry’s boundaries in the battle against global climate change.

    You can have it all

    Using flexible building blocks, we find the optimum fit for your turbine. LM Wind Power provides customized blades with variable root diameters and lengths while ensuring a fast launch on the global market with economies of scale and competitiveness. This modular concept, combined with LM Wind Power’s unique understanding of aerodynamics and loads, has proven to increase Annual Energy Production (AEP) by up to 14% for blades in 2.5-3.3 MW segments. You can have it all: a perfectly optimized blade that leverages LM Wind Power’s global supplier base and manufacturing footprint.

    GL Certified – Safereceptor Insulated Lightning Protection System

    With a track-record of producing more than 125,000 blades with lightning protection systems, we have put that knowledge to work to enable you to capitalize on a competitive GL certified lightning protection (IEC 61400-24 (2010)).

    Global Footprint
    We have a global manufacturing footprint and are a valued partner in established and emerging markets all over the world. Uniformity in our production processes becomes even more important because of our global manufacturing footprint - across 13 locations and 4 continents. We just opened our second factory in India in Vadodara and we now have an even stronger presence in Asia. Also this year we announced a new factory in Izmir, Turkey. As always we are present where our customers want us to be.

    If you are interested in setting up an individual meeting with us during this trade fair, or at another time, please contact Sanne S. Nielsen at ssn@lmwindpower.com

    Links
    Wind Energy Hamburg
    WindEurope Summit

    Share this page

    Meet us at a trade show
    Sanne Staugaard Nielsen

    Reception: Celebrating Our Continued Expansions in India

    Wednesday, Apr. 26, 16:00-17:00

    Come join us at LM Wind Power’s booth for the reception, celebrating LM Wind Power’s presence in India since 1993, along with the establishment of an R&D center in Bangalore and the inauguration of our second production facility in Vadodara in 2016. Take a break from a busy day at the exhibition and join us. We look forward to seeing you!

    Presentations at the Windergy Exhibition

    Panel Discussion

     

    Innovation and Global Technology Trends

    By: Søren Høffer, VP Sales & Marketing

    Time: Wednesday, April 26 from 14:15 – 15:15

    Location: Main Conference Hall – Parallel Session

     

     

    Abstract Presentations - Suite No. 294

     

    Improved Numerical Predictions for Wind Turbine Airfoils

    By: Arun Kumar KT, Senior Engineer, Aero CFD

    Time: Wednesday, April 26 from 14:20 – 14:30

     

    Risk & Reliability Based Maintenance approach for wind turbine blades

    By: Abhay Laxmanrao Waghmare, Senior Manager, Reliability

    Time: Wednesday, April 26 from 15:00 – 15:15

      

    LM serrations for wind turbine noise reduction

    By: Ashish Singh, Lead Engineer, Aero Acoustics

    Time: Thursday, April 27 from 10:50 – 10:55

     

    Driving Innovation while Managing Risks: A Balanced Risk Management Approach for Wind Industry

    By: Pranshu Saxena, Senior Engineer, Reliability

    Time: Thursday, April 27 from 11:20 – 11:25

     

    Proactive Risk Assessments - Keeping Organizations Informed on Engineering, Technological and Operational Changes

    By: Abhay Laxmanrao Waghmare, Senior Manager, Reliability

    Time: Thursday, April 27 from 11:25 – 11:30

     

    Booth Presentations – B209

     

    LM Rotor Size

    By:  Jesper Månsson, Senior Director

    Time: Tuesday, April 25 from 11:30 – 12:00 and Wednesday, April 26 from 11:30 – 12:00

     

    Hybrid

    By:  Jitendra Bijlani, Director, Technology Center India

    Time: Tuesday, April 25 from 15:30 – 16:00 and Wednesday, April 26 15:30 – 16:00

     

    Reliability

    By:  Abhay Laxmanrao Waghmare, Senior Manager, Reliability

    Time: Thursday, April 27 11:30 – 12:00

     

    Press desk

    Meet us

    Trade shows and events

    Here's where you can meet LM Wind Power next.

    Locations

    Global footprint

    In 10 countries on 4 continents

    With blades factories in all major wind energy markets across four continents,  our reach extends beyond anyone else and puts us in pole position to respond faster than competition to the needs of the market. 

    Social media

    Follow us

    LM Wind Power is active on various social media channels. Follow us and stay up to date.

    19-01-2018 22:50:13 | twitter

    LM Wind Power

    Fast fact: An average wind turbine makes up for its carbon footprint within 5 to 8 months of operation! #windworks https://t.co/zWSWINoJPI
    12-01-2018 11:40:50 | twitter

    LM Wind Power

    Blades from @LMWindPower, turbines from @GErenewables, inspiration and drive from @DeepwaterWind - great project for #BlockIsland and US #offshore wind https://t.co/DrDBcryfUs
    10-01-2018 12:34:59 | twitter

    LM Wind Power

    News from Clean #Energy Industrial Forum #CEICIF: “We need to talk about 10-20 bn EUR in R&D to achieve massive benefits for all #electricity users through the lower costs, not 1-2 bn” – Marc de Jong @LMWindPower #EUbudget #CleanEnergyEU https://t.co/fwdvxBLjE6
    02-01-2018 08:43:55 | instagram
    For being such a good Santa last year, the renewable reindeer got him the latest carbon neutral sleigh on the market...see what they did next! From all of us at LM Wind Power, we wish you a happy, greener new year. #CleanSleigh! #LMplaces #lmwindpower #newyear #newyearsresolution #reindeer #santa #christmas #innovation #greenbusiness #wind #windworks #windturbine #windturbines #renewables #windpower #windenergy #renewableenergy #cleanenergy #beautiful #future #love #sustainability #CaseForWind
    27-12-2017 08:36:26 | twitter

    LM Wind Power

    12 can't miss moments from 2017 - We'll let the headlines speak for themselves... https://t.co/hgalcxDUJc
    27-12-2017 08:32:45 | linkedin

    LM Wind Power

    It’s not easy to summarize a year’s worth of dedication, teamwork, challenges and successes from more than 8,000 people, so we’ll let our top headlines speak for themselves!
    24-12-2017 14:00:33 | twitter

    LM Wind Power

    For being such a good Santa last year, the renewable reindeer got him the latest carbon neutral sleigh on the market...see what they did next! https://t.co/xujuyiM1y0 From all of us, Season's Greetings and a greener New Year. #CleanSleigh! https://t.co/OztRUswue5
    24-12-2017 14:00:05 | linkedin

    LM Wind Power

    For being such a good Santa last year, the renewable reindeer got him the latest carbon neutral sleigh on the market...see what they did next! From all of us at LM Wind Power, Season's Greetings and a greener New Year. #CleanSleigh!
    21-12-2017 13:20:01 | linkedin

    LM Wind Power

    In October 2017 our 73.5 P wind turbine blade successfully arrived at Castellón port from our factory located 45 km away. This is the largest blade ever produced and transported in Spain and will be used for harvesting wind at the Merkur wind farm in the North Sea! Check out the transportation of the 73.5 P blade here: http://fal.cn/q5Fl This historic achievement also features in the latest GE report below!
    21-12-2017 13:00:04 | linkedin

    LM Wind Power

    In October 2017 our 73.5 P wind turbine blade successfully arrived at Castellón port from our factory located 45 km away. This is the largest blade ever produced and transported in Spain and will be used for harvesting wind at the Merkur wind farm in the North Sea! Check out the transportation of the 73.5 P blade here: http://fal.cn/q5bE This historic achievement also features in the latest GE report below!