Beatrice, Scotland

Beatrice, Scotland

Customer: REpower

Blade type: LM 61.5 P2
Number of wind turbines: 2
Capacity: 10 MW
Year of delivery: 2007

In collaboration with REpower, LM Wind Power is participating in the "Beatrice Demonstrator Project", to test the performance of the 5 megawatt turbine on the open sea.

Two 5Ms have been installed near the Beatrice oil field in Moray Firth, 25 kilometers off the Scottish East coast and at a water depth of over 40 meters.

The demonstrator project is part of the EU-supported "DOWNVinD" project, Europe's largest research and development program in the field of renewable energies with a total volume of EUR 30 million.

LM MultiReceptors – the safe way to get hit by lightning

On a long blade, there are several places for a lightning to strike. Therefore, it is necessary to place more receptors on the blade for full protection.
> See how the LM MultiReceptor system works

Pre-bending and aerodynamics

Pre-bending is one of the unique features of LM Wind Power blades, designed to optimise the swept area of the rotor.
> More about blade performance